This scope item focuses on a rework process within production. All required rework activities are related to the production order. For this reason, defects are recognized and corrections are initiated, such as insertion of a rework operation within the same production order. The additional rework operation is confirmed and settled within the production order, causing production variances within controlling and price differences for the dedicated product.

Key Process Steps Covered

  • Confirm production activities
  • Confirm scrap for defective material and material that can be reused
  • Confirm production order at rework operation
  • Continue shop-floor activities

Benefits

  • Trigger the rework process automatically with a material in a defined operation
  • Confirm additional activity and material consumption after rework
  • Integrate rework processing fully in the production process

Where is Rework Processing - Work-in-Process(BJQ) being used?

This Scope item is used in the following way:

  • As a core function of Production Operations within Manufacturing Scope Item Group

Process flow of Rework Processing - Work-in-Process (BJQ)

Find below the process flow of the scope item Rework Processing - Work-in-Process as it is defined for release s4hc-2111.


Download Process Flow of Best Practice scenario Rework Processing - Work-in-Process (BJQ) - S/4HANA Cloud
Ref: Manufacturing of SAP S4HC-2111
Best Practices related to S/4HANA*1) Yearly Updates are released per September of each year
*2) The Quarterly updates are released per Februari, May, August and November
Details of future releases can be found in the SAP Roadmap section of each product. Go to SAP Roadmap Product Finder.