Change Manufacturing Bill of Material for Production (3LO)

Change Manufacturing Bill of Material for Production (3LO)

This scope item covers the change-master-controlled updates of a Manufacturing BOM that is used for the production process of components.

The change-number-controlled approach allows date-effectivity-based attributes management on the Manufacturing BOM (MBOM) header level and the Bill of Materials (BOM) items level. Setting the change number status to inactive releases the scope per change number. Once the status becomes inactive, changes are no longer possible. The MBOM header and items can only be changed with a new active change number. The change iteration process starts and ends again with setting the change number status to inactive.

The change-number-controlled update process is followed by the production process which uses the recently updated MBOM.

Key Process Steps Covered

  • Create change master
  • Change change master
  • Exchange a material or component in MBOM
  • Create production order manually

Benefits

  • Control updates in bill of materials for production centrally with change master
  • Manage effective changed day in change master

Where is Change Manufacturing Bill of Material for Production(3LO) being used?

This Scope item is used in the following way:

  • As a core function of Production Engineering within Manufacturing Scope Item Group

No Process Flow details available for scope item Change Manufacturing Bill of Material for Production(3LO)-s4h-2021
Ref: Manufacturing of SAP S4H-2021
Best Practices related to S/4HANA*1) Yearly Updates are released per September of each year
*2) The Quarterly updates are released per Februari, May, August and November
Details of future releases can be found in the SAP Roadmap section of each product. Go to SAP Roadmap Product Finder.
Knowledge Center Scheer Nederland | The Process Experts Visit also the SAP Cloud ERP knowledge center of Scheer Netherlands. The following topics are covered: