
Basic Handover of Bill of Material (1ZI)
Handover to Manufacturing allows the user to create a Manufacturing Bill of Material from an Engineering Bill of Material within one step. The manufacturing Bill of Material is initially being created as a copy of the Engineering Bill of Material. With this step the system automatically generates a linkage between both Bill of Materials. As an optional step this newly created Manufacturing Bill of Material can be reworked with Change Management technology. Finally this Bill of Material will be release for productive use.
Key Process Steps Covered
- Create change master
- Create manufacturing bill of material as copy of engineering bill of material
- Rework manufacturing bill of material
- Release manufacturing bill of material
- Set status of change master to inactive
- Create product version
Benefits
- Simple handover of Engineering Bill of Material to Manufacturing Bill of Material
- Linkage between Engineering and Manufacturing Bill of Material helps to keep both structures in sync
Additional Information
- This scope item is excluded from the default activation
This scope item describes the basic handover functionality of an engineering bill of material (EBOM) to a manufacturing bill of material (MBOM), and is only relevant for customers who want to use this BOM handover functionality.
Where is Basic Handover of Bill of Material(1ZI) being used?
This Scope item is used in the following way:
- As a core function of Product Lifecycle Management within R&D/Engineering Scope Item Group