
Engineering Bill of Material - Mass Change (1R5)
This scope item covers the follow-up material and component date effectivity-controlled mass change process of one or more Engineering Bills of Materials (BOMs). To control the replacement date of the follow-up component or material, you first create a date effectivity-controlled change master. When you start the Where-Used List application with the component or material to replace, all BOMs are listed. To replace the component or material of one or more Engineering BOMs, the BOMs must be selected. The change number is used to manage the phase in date. All changes are managed as draft changes and must be confirmed before setting the change number status to inactive to finalize the mass replacement process.
Key Process Steps Covered
- Create change master
- Display Where-Used List
- Replace material
- Set change master to inactive
Benefits
- Control the exchange of components in an Engineering BOM with Change Master and version management
- Change multiple BOMs with one activity
- Plan future changes for components or materials with date effectivity support
Additional Information
- This scope item is excluded from the default activation
This scope item is only available for customers who have licensed these features before SAP S/4HANA Cloud 1908 including maintenance for these features. For further information, see SAP NoteĀ 2792363.
Where is Engineering Bill of Material - Mass Change(1R5) being used?
This Scope item is used in the following way:
- As a core function of Product Lifecycle Management within R&D/Engineering Scope Item Group