Engineering Bill of Material - Versions Management (1NR)

Engineering Bill of Material - Versions Management (1NR)

An engineering bill of material (EBOM) is a type of bill of material (BOM) that reflects the product as designed by engineering, referred to as the as-designed bill of material. The lifecycle of the EBOM is covered via a new versioning technology. By setting a released status at the header level, the EBOM is ready for handover to manufacturing. After releasing a BOM version, no further changes are allowed. A new version must be created. All process steps are carried out by the BOM engineer. The process distinguishes between major BOM changes where it is copied or created and minor changes where the BOM is being changed.

Key Process Steps Covered

  • Create new versioned BOM
  • Create BOM
  • Release version
  • Perform form fit function change - Negative case
  • Create new version of BOM
  • Release version
  • Perform form fit function change - Positive case
  • Copy (Create) Header Material
  • Copy (Create) versioned BOM
  • Discard versioned BOM
  • Change versioned BOM
  • Release version

Benefits

  • Support EBOM creation and change process
  • Manage lifecycle of EBOM easily by using new release and versioning technology
  • Integrate documents intuitively on text item level with Document Attachment Service
  • Support the stock item and text item categories

Additional Information

  • This scope item is excluded from the default activation

This scope item is only available for customers who have licensed these features before SAP S/4HANA Cloud 1908 including maintenance for these features. For further information, see SAP NoteĀ 2792363.


Where is Engineering Bill of Material - Versions Management(1NR) being used?

This Scope item is used in the following way:

  • As a core function of Product Lifecycle Management within R&D/Engineering Scope Item Group

Process flow of Engineering Bill of Material - Versions Management (1NR)

Find below the process flow of the scope item Engineering Bill of Material - Versions Management as it is defined for release s4hc-2111.


Download Process Flow of Best Practice scenario Engineering Bill of Material - Versions Management (1NR) - S/4HANA Cloud
Ref: R&D/Engineering of SAP S4HC-2111
Best Practices related to S/4HANA*1) Yearly Updates are released per September of each year
*2) The Quarterly updates are released per Februari, May, August and November
Details of future releases can be found in the SAP Roadmap section of each product. Go to SAP Roadmap Product Finder.
Knowledge Center Scheer Nederland | The Process Experts Visit also the SAP Cloud ERP knowledge center of Scheer Netherlands. The following topics are covered:
Place comment